MII Production Rollout

MII Production Rollout

Industrialize your research factory by expanding the data footprint to cover the full breadth of MII requirements across your established infrastructure.

Timeline

3-6 Months

The Transition

Migration of all pilot configurations to a high-availability production environment. Standard Annual Licensing for Ignifyr (and Repofyr, if selected) commences.

Package Content

Full KDS Expansion

Integration of all remaining KDS modules relevant to your site maturity.

Production Hardening

High-Availability (HA) deployment with automated backups, failover protocols, and integration with local identity providers.

FDPG Workflow Integration

Alignment of platform outputs with the requirements of the national research portal (FDPG).

Advanced Terminology Normalization

Technical orchestration of local-to-standard translations, mediated by your site’s clinical experts.

Automated Refresh Pipelines

Implementation of incremental loading patterns to keep your repository (Repofyr/Firely/Blaze) synced with routine care data.

The Engagament Path

We don’t just leave you with a pilot. This engagement is the first step in a long-term partnership.

MII Production Rollout (Current)

Scaling to full core data set.

3

Managed Operations & Optimization (Ongoing)

Sustaining your research ecosystem.